Project Completion Certificate (Ground Water)
Scheme ID: 20094978 Name of Scheme: KARRAKA MVS No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 5002 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 20-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 17.0 M / 47.60 M KARRAKA 27.49431 79.65013
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 1050 LPM / 63 M KARRAKA 27.49431 79.65013
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL / 16 M KARRAKA 27.49431 79.65013
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE / K-7 150 0.016 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 .427 COMPLETE
2 HDPE 63 7.156 COMPLETE
3 HDPE 110 1.286 COMPLETE
4 HDPE 140 .116 COMPLETE
5 HDPE 160 .393 COMPLETE
HSC Connection
Sno. Total Nos.
1 595
Other Details
3.73
3.60
3.43
20-Jul-2024
21-Jul-2024