Project Completion Certificate (Ground Water)
Scheme ID: 20094941 Name of Scheme: GOPALPUR VILLAGE WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 1465 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-May-2024 Actual Date of Completion (Capex): 14-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300x150 59.75/12 Gopalpur 25.731283 82.798739
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 7.5HP 282/44 Gopalpur 25.731283 82.798739
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100KL/12M Gopalpur 25.731204 82.798719
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 200 0.0081 Yes
2 K-7 80 0.016.4 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 90 2.265 Yes
2 PN-6 75 1.921 Yes
3 PN-6 63 3.192 Yes
4 PN-6 110 0.510 Yes
5 PN-6 140 0.608 Yes
6 PN-6 160 0.252 Yes
HSC Connection
Sno. Total Nos.
1 263
Other Details
2.32
2.32
1.84
14-Aug-2025
14-Aug-2025