Project Completion Certificate (Ground Water)
Scheme ID: 20094610 Name of Scheme: BASERA KHURD & ABDIPUR MVS (O) No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1894 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 01-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.07/102.26 Baseda Khurd 28.7835 78.2960
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 400/46 Baseda Khurd 28.7835 78.2960
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 125/14 Baseda Khurd 28.7836 78.2962
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 100 0.0167
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 0
2 PN-6 PE100/HDPE 75 0.2784
3 PN-6 PE100/HDPE 63 3.1091
4 PN-6 PE100/HDPE 110 0.6443
5 PN-6 PE100/HDPE 125 0.02150
6 PN-6 PE100/HDPE 140 1.817
7 PN-6 PE100/HDPE 160 0.7867
8 PN-6 PE100/HDPE 180 0.048
HSC Connection
Sno. Total Nos.
1 335
Other Details
1.76
0.00
1.76
13-Aug-2025
14-Aug-2025