Project Completion Certificate (Ground Water)
Scheme ID: 20094282 Name of Scheme: MAKHDUM KALAN & BHANDARA SHEKHPUR & Muhiuddin pur Water Supply Scheme No. of Villages: 3 No. of Habitation Covered: 15
Total Population Covered: 8414 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Mar-2024 Actual Date of Completion (Capex): 09-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 20.84/75.3 MAKHDUM KALAN & BHANDARA SHEKHPUR & Muhiuddin pur Water Supply Scheme 26.564237 81.696627
2 TUBEWELL -2 20.20/77.01 MAKHDUM KALAN & BHANDARA SHEKHPUR & Muhiuddin pur 26.572230 81.696732
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE - 1 835/58 MAKHDUM KALAN & BHANDARA SHEKHPUR & Muhiuddin pur Water Supply Scheme 26.564237 81.696627
2 SUBMERSIBLE -2 835/58 MAKHDUM KALAN & BHANDARA SHEKHPUR & Muhiuddin pur 26.572230 81.696732
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 500/20 MAKHDUM KALAN & BHANDARA SHEKHPUR & Muhiuddin pur Water Supply Scheme 26.564237 81.696627
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.939
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 21.106
2 HDPE 90 3.026
3 HDPE 110 2.453
4 HDPE 140 0.641
5 HDPE 160 3.928
6 HDPE 180 0.747
7 HDPE 200 1.797
HSC Connection
Sno. Total Nos.
1 1527
Other Details
8.11
0.00
7.98
09-May-2025
10-Aug-2025