Project Completion Certificate (Ground Water)
Scheme ID: 20094237 Name of Scheme: asvi No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1550 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Apr-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18/127.13 Asvi 26.50625756 79.6195912
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 23.40/57 Asvi 26.50625756 79.6195912
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 Asvi 26.50625758 79.6195912
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.024 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.0 As per Site
2 HDPE 75 1.495 As per Site
3 HDPE 90 0.614 As per Site
4 HDPE 110 0.3375 As per Site
HSC Connection
Sno. Total Nos.
1 290
Other Details
1.27
1.64
1.64
31-Mar-2024
01-Apr-2024