| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20094171 | Name of Scheme: RASULPUR & URWA Water Supply Scheme | No. of Villages: 2 | No. of Habitation Covered: 15 |
| Total Population Covered: 6653 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 12-Mar-2024 | Actual Date of Completion (Capex): 24-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL -1 | 27.10/89.69 | RASULPUR & URWA | 26.485196 | 81.615366 |
| 2 | TUBEWELL -2 | 24.07/88.25 | RASULPUR & URWA | 26.484560 | 81.613010 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE -1 | 675 LPM/56 M | RASULPUR & URWA | 26.485196 | 81.615366 |
| 2 | SUBMERSIBLE -2 | 675 LPM/56 M | RASULPUR & URWA | 26.484560 | 81.613010 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 400 KL/18M | RASULPUR & URWA | 26.485196 | 81.615366 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.52 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 19.166 | |
| 2 | HDPE | 90 | 4.330 | |
| 3 | HDPE | 110 | 0.765 | |
| 4 | HDPE | 140 | 1.970 | |
| 5 | HDPE | 160 | 1.034 | |
| 6 | HDPE | 180 | 1.842 | |
| 7 | HDPE | 200 | 0.543 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1182 |