Project Completion Certificate (Ground Water)
Scheme ID: 20094171 Name of Scheme: RASULPUR & URWA Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 15
Total Population Covered: 6653 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Mar-2024 Actual Date of Completion (Capex): 24-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL -1 27.10/89.69 RASULPUR & URWA 26.485196 81.615366
2 TUBEWELL -2 24.07/88.25 RASULPUR & URWA 26.484560 81.613010
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE -1 675 LPM/56 M RASULPUR & URWA 26.485196 81.615366
2 SUBMERSIBLE -2 675 LPM/56 M RASULPUR & URWA 26.484560 81.613010
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 400 KL/18M RASULPUR & URWA 26.485196 81.615366
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.52
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 19.166
2 HDPE 90 4.330
3 HDPE 110 0.765
4 HDPE 140 1.970
5 HDPE 160 1.034
6 HDPE 180 1.842
7 HDPE 200 0.543
HSC Connection
Sno. Total Nos.
1 1182
Other Details
7.13
0.00
7.11
24-Mar-2025
18-Jun-2025