| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20093428 | Name of Scheme: Rajpura PWS | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 1516 | Base Year: 2023 | Intermediate Year: 0 | Design Year: 0 |
| Date of Completion (As per Contract): 01-Jun-2022 | Actual Date of Completion (Capex): 03-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL | 18 M / 108.22 M | RAJPURA | 26.519246 | 79.321546 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 350 LPM / 49 M | RAJPURA | 26.519246 | 79.321546 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100 KL / 12 M | RAJPURA | 26.519246 | 79.321546 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0091 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.268 | |
| 2 | HDPE | 90 | 0.803 | |
| 3 | HDPE | 110 | 1.790 | |
| 4 | HDPE | 125 | 0.093 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 243 |