Project Completion Certificate (Ground Water)
Scheme ID: 20093114 Name of Scheme: RAMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3579 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 09-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.21 M / 94.62 M Rampur 26.411957 82.089565
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 477 LPM / 42 M Rampur 26.411957 82.089565
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 12 M Rampur 26.411957 82.089565
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K9 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6:Class PE-100 63 8.9
2 HDPE / PN-6:Class PE-100 75 0.969
3 HDPE / PN-6:Class PE-100 90 0.603
4 HDPE / PN-6:Class PE-100 110 0.72
5 HDPE / PN-6:Class PE-100 125 1.087
6 HDPE / PN-6:Class PE-100 140 1.315
7 HDPE / PN-6:Class PE-100 160 0.45
8 HDPE / PN-6:Class PE-100 180 0.32
9 HDPE / PN-6:Class PE-100 200 0.122
HSC Connection
Sno. Total Nos.
1 399
Other Details
2.07
0.00
2.11
09-Feb-2025
01-Apr-2025