Project Completion Certificate (Ground Water)
Scheme ID: 20093026 Name of Scheme: MOHIUDDINPUR & BARKHERA MVS No. of Villages: 5 No. of Habitation Covered: 6
Total Population Covered: 4391 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2024 Actual Date of Completion (Capex): 30-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.07 M / 141.49 M MOHIUDDINPUR 27.55459 79.24799
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 950 LPM / 63 M MOHIUDDINPUR 27.55459 79.24799
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275 KL / 16 M MOHIUDDINPUR 27.55459 79.24799
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE / K-7 150 .04 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.535 COMPLETE
2 HDPE 63 13.189 COMPLETE
3 HDPE 140 4.214 COMPLETE
4 HDPE 180 .079 COMPLETE
HSC Connection
Sno. Total Nos.
1 937
Other Details
4.88
4.77
4.88
30-Jun-2024
01-Jul-2024