| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092876 | Name of Scheme: MAU GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 2570 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 18-Jul-2024 | Actual Date of Completion (Capex): 27-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 22.02 M / 75.26 M | Mau | 26.411338 | 81.935443 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 363 LPM / 42 M | Mau | 26.411338 | 81.935443 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100 KL / 12 M | Mau | 26.411338 | 81.935443 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI /K9 | 100 | 0.010 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE /PN6:Class PE-100 | 63 | 7.514 | |
| 2 | HDPE /PN6:Class PE-100 | 75 | 0.509 | |
| 3 | HDPE /PN6:Class PE-100 | 90 | 0.27 | |
| 4 | HDPE /PN6:Class PE-100 | 110 | 1.345 | |
| 5 | HDPE /PN6:Class PE-100 | 125 | 0.14 | |
| 6 | HDPE /PN6:Class PE-100 | 140 | 0.38 | |
| 7 | HDPE /PN6:Class PE-100 | 160 | 0.86 | |
| 8 | HDPE /PN6:Class PE-100 | 180 | 0.141 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 359 |