Project Completion Certificate (Ground Water)
Scheme ID: 20092792 Name of Scheme: SABITPUR Water Supply Scheme No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2190 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Mar-2024 Actual Date of Completion (Capex): 11-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 55.26M / 18.13M Sabitpur 26.319477 83.097722
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP Submersible Pump 460LPM / 45M Sabitpur 26.319477 83.097722
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 125 KL/ 14 M Sabitpur 26.319477 83.097722
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 80 0.04 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.676
2 HDPE Pipe PN-6: Class PE-100 75 2.980
3 HDPE Pipe PN-6: Class PE-100 63 6.864
4 HDPE Pipe PN-6: Class PE-100 110 0.768
5 HDPE Pipe PN-6: Class PE-100 140 1.353
6 HDPE Pipe PN-6: Class PE-100 160 0.122
HSC Connection
Sno. Total Nos.
1 305
Other Details
2.02
2.01
2.01
12-Dec-2025
13-Dec-2025