Project Completion Certificate (Ground Water)
Scheme ID: 20092661 Name of Scheme: RAIPUR KHAS, BAHLOLPUR & MEDPUR MVS No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 4236 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 10-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.04 M / 91.36 M BAHLOLPUR 27.59018 79.31724
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 900 LPM / 65 M BAHLOLPUR 27.59018 79.31724
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 KL / 18 M BAHLOLPUR 27.59018 79.31724
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE / K-7 150 0.27 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 .849 COMPLETE
2 HDPE 63 7.783 COMPLETE
3 HDPE 110 .211 COMPLETE
4 HDPE 140 .945 COMPLETE
5 HDPE 180 1.007 COMPLETE
6 HDPE 200 2.317 COMPLETE
HSC Connection
Sno. Total Nos.
1 1106
Other Details
4.41
4.31
4.41
10-Jun-2024
11-Jun-2024