Project Completion Certificate (Ground Water)
Scheme ID: 20092655 Name of Scheme: budhauli No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3826 Base Year: 2023 Intermediate Year: 2034 Design Year: 2023
Date of Completion (As per Contract): 31-Mar-2023 Actual Date of Completion (Capex): 20-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 72/66.35 BUDHAULI 26°33'0496'' 79°67'0928''
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 750/72 BUDHUALI 26°33'0496'' 79°67'0928''
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225/16 BUDHAULI 26°33'0496'' 79°67'0928''
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.025 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.5
2 HDPE 90 1.57
3 HDPE 110 1.69
4 HDPE 140 0.185
5 HDPE 160 0.138
HSC Connection
Sno. Total Nos.
1 840
Other Details
3.28
0.00
3.21
01-Apr-2024
02-Apr-2024