Project Completion Certificate (Ground Water)
Scheme ID: 20092538 Name of Scheme: KUDENA CHAK SVS (O) No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2647 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2027 Actual Date of Completion (Capex): 18-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Solar Powered Pump 18.07/99.41 Kudaina Chak 28.77086543 78.18399012
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 560/41 Kudaina Chak 28.77086543 78.18399012
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 K-7/DI 175/12 Kudaina Chak 28.770846 78.18396289
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 0.0919
2 PN-6 PE100/HDPE 75 1.2441
3 PN-6 PE100/HDPE 63 3.5403
4 PN-6 PE100/HDPE 125 0.0336
5 PN-6 PE100/HDPE 140 0.2654
6 PN-6 PE100/HDPE 160 0.2933
HSC Connection
Sno. Total Nos.
1 588
Other Details
1.74
0.00
1.65
29-Jun-2026
30-Jun-2026