| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20091781 | Name of Scheme: JEONTA & KHIRIA MUKUND MVS | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 6222 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-Jun-2027 | Actual Date of Completion (Capex): 17-Sep-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 48.18M/300.51M | JEOTA | 27.25706 | 79.40139 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 625M/65M | JEOTA | 27.25706 | 79.40139 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 350KL/18M | JEOTA | 27.25706 | 79.40139 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.210 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 3.991 | |
| 2 | HDPE PIPE | 63 | 10.416 | |
| 3 | HDPE PIPE | 110 | 2.465 | |
| 4 | HDPE PIPE | 140 | 0.111 | |
| 5 | HDPE PIPE | 160 | 0.399 | |
| 6 | HDPE PIPE | 180 | 1.405 | |
| 7 | HDPE PIPE | 200 | 0.825 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |