| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20091744 | Name of Scheme: KHINMINI & SADIKPUR | No. of Villages: 2 | No. of Habitation Covered: 9 |
| Total Population Covered: 8356 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 30-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 31.69 M / 118.87 | KHINMINI | 27.43596 | 79.48476 |
| 2 | TUBEWELL-2 | 25.0 M / 123.60 M | KHINMINI | 27.43095 | 79.48367 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 850 LPM / 70 M | KHINMINI | 27.43596 | 79.48476 |
| 2 | PUMP-2 | 850 LPM / 70 M | KHINMINI | 27.43095 | 79.48367 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 500 KL / 18 M | KHINMINI | 27.43596 | 79.48476 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | .030 | COMPLETE |
| 2 | DI PIPE-2nd PH | 150 | .883 | COMPLETE |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 7.102 | COMPLETE |
| 2 | HDPE | 63 | 12.904 | COMPLETE |
| 3 | HDPE | 110 | .418 | COMPLETE |
| 4 | HDPE | 125 | 1.014 | COMPLETE |
| 5 | HDPE | 140 | 3.916 | COMPLETE |
| 6 | HDPE | 200 | 1.175 | COMPLETE |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1588 |