Project Completion Certificate (Ground Water)
Scheme ID: 20091744 Name of Scheme: KHINMINI & SADIKPUR No. of Villages: 2 No. of Habitation Covered: 9
Total Population Covered: 8356 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 30-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 31.69 M / 118.87 KHINMINI 27.43596 79.48476
2 TUBEWELL-2 25.0 M / 123.60 M KHINMINI 27.43095 79.48367
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 850 LPM / 70 M KHINMINI 27.43596 79.48476
2 PUMP-2 850 LPM / 70 M KHINMINI 27.43095 79.48367
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 500 KL / 18 M KHINMINI 27.43596 79.48476
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 .030 COMPLETE
2 DI PIPE-2nd PH 150 .883 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 7.102 COMPLETE
2 HDPE 63 12.904 COMPLETE
3 HDPE 110 .418 COMPLETE
4 HDPE 125 1.014 COMPLETE
5 HDPE 140 3.916 COMPLETE
6 HDPE 200 1.175 COMPLETE
HSC Connection
Sno. Total Nos.
1 1588
Other Details
7.68
7.44
7.66
30-Jun-2024
01-Jul-2024