Project Completion Certificate (Ground Water)
Scheme ID: 20091701 Name of Scheme: ADDUPUR DEHAMAFI & DALELGANG MVS No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 4542 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 14-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 33.12 M / 119.50 M ADDUPUR DEHAMAFI 27.48413 79.42650
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 950 LPM / 63 M ADDUPUR DEHAMAFI 27.48413 79.42650
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275 KL / 16 M ADDUPUR DEHAMAFI 27.48413 79.42650
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K-7 150 .03 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.514 COMPLETE
2 HDPE 63 5.569 COMPLETE
3 HDPE 110 .785 COMPLETE
4 HDPE 140 .577 COMPLETE
5 HDPE 200 2.631 COMPLETE
HSC Connection
Sno. Total Nos.
1 902
Other Details
4.03
3.93
4.02
14-Jun-2024
15-Jun-2024