Project Completion Certificate (Ground Water)
Scheme ID: 20090047 Name of Scheme: Bali - Saidipur Urf Ramnagar No. of Villages: 2 No. of Habitation Covered: 1
Total Population Covered: 6102 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 25-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 42.04 Mtr / 100.07 Mtr BALI 29.011726 77.91338
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1250 LPM / 54 Mtr BALI 29.011726 77.91338
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350 Kl / 16 M BALI 29.011726 77.91338
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.374
2 HDPE 90 1.195
3 HDPE 160 0.427
4 HDPE 180 0.256
HSC Connection
Sno. Total Nos.
1 527
Other Details
4.77
4.77
2.93
12-Dec-2024
13-Dec-2024