Project Completion Certificate (Ground Water)
Scheme ID: 20089890 Name of Scheme: ANIRUDHHAPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 1580 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Mar-2024 Actual Date of Completion (Capex): 04-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEELL 18.17/62.15 ANIRUDDHPUR 26.19221 82.514515
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP-1 340LPM/43M ANIRUDDHPUR 26.19221 82.514515
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100KL/12M ANIRUDDHPUR 26.19221 82.514515
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K-7 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6:CLASS PE-100 63 8.887
2 HDPE PIPE PN-6:CLASS PE-100 75 0.805
3 HDPE PIPE PN-6:CLASS PE-100 90 0.452
4 HDPE PIPE PN-6:CLASS PE-100 110 0.686
5 HDPE PIPE PN-6:CLASS PE-100 140 0.043
HSC Connection
Sno. Total Nos.
1 220
Other Details
158.79
0.00
157.25
04-Jan-2026
01-Feb-2026