Project Completion Certificate (Ground Water)
Scheme ID: 20089632 Name of Scheme: Guhani khurd PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 914 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 07-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 12.06 M / 85.30 M GUHANI KHURD 26.532032 79.271613
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 200 LPM / 49 M GUHANI KHURD 26.532032 79.271613
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 KL / 12 M GUHANI KHURD 26.532032 79.271613
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 0.923
2 HDPE 90 0.938
3 HDPE 110 0.275
HSC Connection
Sno. Total Nos.
1 199
Other Details
1.00
0.00
1.00
06-Jan-2025
08-Jan-2025