| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20089626 | Name of Scheme: Gazipur ishawari prasad | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 1230 | Base Year: 2023 | Intermediate Year: 0 | Design Year: 0 |
| Date of Completion (As per Contract): 01-Jun-2022 | Actual Date of Completion (Capex): 02-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 12 Mtr / 114.43 mtr | Gazipur | 26.441751 | 79.547284 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 250 LPM / 59 Mtr | Gazipur | 26.441751 | 79.547284 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 50 KL / 12 Mtr | Gazipur | 26.441751 | 79.547284 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 0.014 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.163 | |
| 2 | HDPE | 90 | 1.734 | |
| 3 | HDPE | 110 | 0.211 | |
| 4 | HDPE | 125 | 1.648 | |
| 5 | HDPE | 140 | 0.770 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 331 |