Project Completion Certificate (Ground Water)
Scheme ID: 20089310 Name of Scheme: PANERUA No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2550 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Mar-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 22.02/121.35 Panerua 26.059674 80.414048
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submerssible Pump 550/57 Panerua 26.059674 80.414048
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Panerua 26.059674 80.414048
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K-7 100 16.30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.723
2 HDPE 90 0.095
3 HDPE 110 0.162
4 HDPE 125 0.14
5 HDPE 140 0.431
6 HDPE 180 0.19
7 HDPE 200 1.08
HSC Connection
Sno. Total Nos.
1 465
Other Details
1.95
1.94
1.98
05-Oct-2025
06-Oct-2025