Project Completion Certificate (Ground Water)
Scheme ID: 20089220 Name of Scheme: DANDA AMAULI No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3750 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-Mar-2024 Actual Date of Completion (Capex): 06-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 21.01/105.58 Danda Amauli 25.544848 80.324525
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submerssible Pump 800/63 Danda Amauli 25.544848 80.324525
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/16 Danda Amauli 25.544848 80.324525
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K-7 200 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.855
2 HDPE 75 1.073
3 HDPE 90 1.144
4 HDPE 110 0.538
5 HDPE 140 1.112
6 HDPE 160 1.570
7 HDPE 180 0.275
8 HDPE 200 0.334
HSC Connection
Sno. Total Nos.
1 585
Other Details
2.90
0.00
2.87
30-Sep-2024
01-Oct-2024