Project Completion Certificate (Ground Water)
Scheme ID: 20089187 Name of Scheme: Gahlai No. of Villages: 4 No. of Habitation Covered: 20
Total Population Covered: 5620 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Sep-2024 Actual Date of Completion (Capex): 18-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X200 42.05/116.74 Gahlai 25.560811 82.557487
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-25HP 1100/49.60 Gahlai 25.560811 82.557487
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300/14 Gahlai 25.560717 82.557462
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 200 0.012
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 200 0.257
2 HDPE PIPE PN-6 160 0.232
3 HDPE PIPE PN-6 140 1.449
4 HDPE PIPE PN-6 110 3.022
5 HDPE PIPE PN-6 90 0.988
6 HDPE PIPE PN-6 75 1.115
7 HDPE PIPE PN-6 63 16.302
HSC Connection
Sno. Total Nos.
1 635
Other Details
3.38
3.18
2.91
18-Sep-2025
19-Sep-2025