| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20087019 | Name of Scheme: TILAK TANDA WSS | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 2670 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 24-Mar-2024 | Actual Date of Completion (Capex): 12-Jul-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of borewell Assembly | 62M / 21.05 M | Tilak tanda | 26.399009 | 82.945821 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 10 HP Submersible Pump | 560 LPM/ 43 M | Tilak tanda | 26.399009 | 82.945821 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 150 KL/ 12 MTR | Tilak tanda | 26.399009 | 82.945821 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 100 | 0.04 | 0.0375 |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 90 | 1.946 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 5..167 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 63 | 6.406 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.506 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.275 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.044 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 320 |