Project Completion Certificate (Ground Water)
Scheme ID: 20086891 Name of Scheme: JIYAN CHAK REORGANISATION W/S SCHEME (VSA) No. of Villages: 10 No. of Habitation Covered: 20
Total Population Covered: 4662 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jun-2024 Actual Date of Completion (Capex): 11-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 34mtr/283.55mtr Jiyanchak 25.558792 83.223925
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 1000LPM/46Mtr Jiyanchak 25.558792 83.223925
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/16Mtr Jiyanchak 25.558792 83.223925
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.05
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.606
2 HDPE 75 2.454
3 HDPE 63 18.699
4 HDPE 110 1.446
5 HDPE 125 2.646
6 HDPE 140 2.355
7 HDPE 160 0.0347
8 HDPE 180 0.181
9 HDPE 200 0.216
HSC Connection
Sno. Total Nos.
1 649
Other Details
5.13
0.00
4.26
11-Dec-2025
26-Dec-2025