| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20086811 | Name of Scheme: NATHMALPUR HETHARIYA WSS | No. of Villages: 6 | No. of Habitation Covered: 13 |
| Total Population Covered: 4460 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 24-Mar-2024 | Actual Date of Completion (Capex): 22-Jul-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of borewell Assembly | 54.76M / 30.14M | Faridpur Hetariya | 26.20551 | 83.03372 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 17.5 HP Submersible Pump | 920LPM/46M | Faridpur Hetariya | 26.20551 | 83.03372 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 250KL/16MTR | Faridpur Hetariya | 26.20551 | 83.03372 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 100 | 0.04 | 0.04 |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 90 | 1.740 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 5.183 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 63 | 13.475 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.817 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | 1.801 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 160 | 1.662 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 200 | 1.702 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 600 |