Project Completion Certificate (Ground Water)
Scheme ID: 20086712 Name of Scheme: Mairi GP Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2340 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 19-Nov-2024 Actual Date of Completion (Capex): 14-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MSERW PLAIN PIPE-200MM 36M MAIRI 27.367505 83.672875
2 MSERW SLOTTED PIPE-150 MM 18 MAIRI 27.367505 83.672875
3 MSERW PLAIN PIPE-150 MM 75.2 MAIRI 27.367505 83.672875
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 26.99/39M MAIRI 27.367505 83.672875
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZINK ALM OHT 150KL/14M MAIRI 27.367390 83.672730
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DOUBLE FLANGE DI-K9 150 0.0295
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6/PE-100/HDPE 63 1.91
2 PN-6/PE-100/HDPE 75 1.39
3 PN-6/PE-100/HDPE 90 1.71
4 PN-6/PE-100/HDPE 110 0.29
HSC Connection
Sno. Total Nos.
1 237
Other Details
1.55
0.00
1.55
15-Oct-2025
15-Oct-2025