Project Completion Certificate (Ground Water)
Scheme ID: 20085832 Name of Scheme: KALYANPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2644 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Jul-2024 Actual Date of Completion (Capex): 17-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 17.30 KALYANPUR 26.388498 81.650101
2 200MM PLAIN PIPE 60.00 KALYANPUR 26.388498 81.650101
3 150MM SLOTTED PIPE 6.00 KALYANPUR 26.388498 81.650101
4 200MM SLOTTED PIPE 12.00 KALYANPUR 26.388498 81.650101
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE 250LPM/52 MTR KALYANPUR 26.388498 81.650101
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 100KL/ 14MTR KALYANPUR 26.388498 81.650101
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.0243
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 4.618
2 HDPE PIPE 63 12.569
3 HDPE PIPE 110 0.501
4 HDPE PIPE 140 1.260
5 HDPE PIPE 160 0.188
6 HDPE PIPE 200 0.256
HSC Connection
Sno. Total Nos.
1 597
Other Details
3.29
0.00
3.26
20-Sep-2024
07-Jan-2025