| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20085832 | Name of Scheme: KALYANPUR WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 2644 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 20-Jul-2024 | Actual Date of Completion (Capex): 17-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150MM PLAIN PIPE | 17.30 | KALYANPUR | 26.388498 | 81.650101 |
| 2 | 200MM PLAIN PIPE | 60.00 | KALYANPUR | 26.388498 | 81.650101 |
| 3 | 150MM SLOTTED PIPE | 6.00 | KALYANPUR | 26.388498 | 81.650101 |
| 4 | 200MM SLOTTED PIPE | 12.00 | KALYANPUR | 26.388498 | 81.650101 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE | 250LPM/52 MTR | KALYANPUR | 26.388498 | 81.650101 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 100KL/ 14MTR | KALYANPUR | 26.388498 | 81.650101 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | 0.0243 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 4.618 | |
| 2 | HDPE PIPE | 63 | 12.569 | |
| 3 | HDPE PIPE | 110 | 0.501 | |
| 4 | HDPE PIPE | 140 | 1.260 | |
| 5 | HDPE PIPE | 160 | 0.188 | |
| 6 | HDPE PIPE | 200 | 0.256 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 597 |