| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20085729 | Name of Scheme: KHARAULI WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 3495 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2024 | Actual Date of Completion (Capex): 30-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150 MM PLAIN PIPE | 261.30 | KHARAULI | 26.251785 | 81.514437 |
| 2 | 300 MM PLAIN PIPE | 61 | KHARAULI | 26.251785 | 81.514437 |
| 3 | 150MM SLOTTED PIPE | 33.00 | KHARAULI | 26.251785 | 81.514437 |
| 4 | 300MM SLOTTED PIPE | 5.00 | KHARAULI | 26.251785 | 81.514437 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE PUMP | 750 LPM / 56 MTR | KHARAULI | 26.251785 | 81.514437 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225KL / 18 M | KHARAULI | 26.251785 | 81.514437 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.0255 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 0.624 | |
| 2 | HDPE PIPE | 75 | 1.233 | |
| 3 | HDPE PIPE | 63 | 8.828 | |
| 4 | HDPE PIPE | 110 | 1.017 | |
| 5 | HDPE PIPE | 125 | 0.0122 | |
| 6 | HDPE PIPE | 160 | 0.285 | |
| 7 | HDPE PIPE | 180 | 0.0115 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 598 |