Project Completion Certificate (Ground Water)
Scheme ID: 20085678 Name of Scheme: NARAULI & ROSHANI KHURD WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 15
Total Population Covered: 5521 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Mar-2024 Actual Date of Completion (Capex): 19-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL-1 30.04/324.28 NARAULI & ROSHANI KHURD 26.250407 81.658363
2 TUBEWELL-2 36.10/234.20 NARAULI & ROSHANI KHURD 26.244447 81.658712
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE -1 550 LPM/ 54 M NARAULI & ROSHANI KHURD 26.250407 81.658363
2 SUBMERSIBLE -2 550 LPM/ 54 M NARAULI & ROSHANI KHURD 26.244447 81.658712
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 325 KL/16 M NARAULI & ROSHANI KHURD 26.250407 81.658363
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.918
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 19.467
2 HDPE 90 1.665
3 HDPE 110 3.262
4 HDPE 140 3.232
5 HDPE 160 0.505
6 HDPE 180 2.707
7 HDPE 200 0.018
HSC Connection
Sno. Total Nos.
1 457
Other Details
6.61
0.00
6.61
19-Sep-2024
20-Dec-2024