| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20085289 | Name of Scheme: Kisoli WSS GOV | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3115 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Aug-2024 | Actual Date of Completion (Capex): 04-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30.07M / 100.24M | Kisoli | 28.562749 | 77.858631 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 590 LPM / 45 M | Kisoli | 28.562749 | 77.858631 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175 Kl / 12M | Kisoli | 28.562873 | 77.858704 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 0.017 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 10.64 | |
| 2 | HDPE | 75 | 0.59 | |
| 3 | HDPE | 90 | 0.73 | |
| 4 | HDPE | 110 | 0.46 | |
| 5 | HDPE | 125 | 0.54 | |
| 6 | HDPE | 140 | 0.20 | |
| 7 | HDPE | 160 | 1.02 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 441 |