Project Completion Certificate (Ground Water)
Scheme ID: 20084708 Name of Scheme: Chichauli PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2015 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 14-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18.01 m / 126.31m Chichauli 26.516898 79.546821
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 450 LPM / 59 M Chichauli 26.516898 79.546821
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 KL / 12 M Chichauli 26.516898 79.546821
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D I 100 0.0109
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.413
2 HDPE 90 1.085
3 HDPE 110 0.256
4 HDPE 125 0.902
5 HDPE 140 0.484
HSC Connection
Sno. Total Nos.
1 453
Other Details
1.87
0.00
1.91
13-Mar-2025
15-Mar-2025