| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20084320 | Name of Scheme: RAMPUR BABUWAN WSS | No. of Villages: 1 | No. of Habitation Covered: 14 |
| Total Population Covered: 3060 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Mar-2024 | Actual Date of Completion (Capex): 10-Nov-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.00/63.30 | RAMPUR BABUWAN | 26.506283 | 81.813066 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 644LPM/45M | RAMPUR BABUWAN | 26.506283 | 81.813066 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200KL/14M | RAMPUR BABUWAN | 26.506283 | 81.813066 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 PE100 | 63 | 11.460 | |
| 2 | HDPE PN-6 PE100 | 75 | 0.582 | |
| 3 | HDPE PN-6 PE100 | 90 | 1.086 | |
| 4 | HDPE PN-6 PE100 | 110 | 1.162 | |
| 5 | HDPE PN-6 PE100 | 125 | 0.953 | |
| 6 | HDPE PN-6 PE100 | 140 | 0.426 | |
| 7 | HDPE PN-6 PE100 | 180 | 2.227 | |
| 8 | HDPE PN-6 PE100 | 200 | 0.251 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 530 |