Project Completion Certificate (Ground Water)
Scheme ID: 20084221 Name of Scheme: AANAPURNARAYANGANJ WSS No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2220 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Mar-2023 Actual Date of Completion (Capex): 21-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15/70 AANAPURNARAYANGANJ 26.098394 82.275924
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 470LPM/41M AANAPURNARAYANGANJ 26.098394 82.275924
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125KL/12M AANAPURNARAYANGANJ 26.098343 82.275741
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.207
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 10.563
2 HDPE-PN-6 , PE-100 75 2.327
3 HDPE-PN-6 , PE-100 90 1.325
4 HDPE-PN-6 , PE-100 110 1.035
5 HDPE-PN-6 , PE-100 125 0.565
6 HDPE-PN-6 , PE-100 140 0.151
7 HDPE-PN-6 , PE-100 160 0.225
8 HDPE-PN-6 , PE-100 180 0.441
HSC Connection
Sno. Total Nos.
1 320
Other Details
2.04
2.04
2.44
30-Mar-2025
25-Mar-2026