Project Completion Certificate (Ground Water)
Scheme ID: 20083429 Name of Scheme: DEIPUR WSS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2670 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Mar-2024 Actual Date of Completion (Capex): 27-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 21.04/90.86 DEIPUR 26.596162 82.461591
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 12.5 HP 0.56/45 DEIPUR 26.596162 82.461591
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 175KL/14M DEIPUR 26.596162 82.461591
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.02
2 DI-K7 100 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6:Class PE-100 90 1.32
2 HDPE Pipe PN-6:Class PE-100 75 2.32
3 HDPE Pipe PN-6:Class PE-100 63 5.92
4 HDPE Pipe PN-6:Class PE-100 110 1.54
5 HDPE Pipe PN-6:Class PE-100 160 0.77
6 HDPE Pipe PN-6:Class PE-100 180 0.74
HSC Connection
Sno. Total Nos.
1 410
Other Details
2.31
2.31
2.31
20-Jan-2026
21-Jan-2026