Project Completion Certificate (Ground Water)
Scheme ID: 20082823 Name of Scheme: NAGLI AJAR SALEMPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1687 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 11-Jun-2025 Actual Date of Completion (Capex): 16-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 36.21 Mtr / 105.19 Mtr NAGLI AJAR SALEMPUR 29.180264 77.777803
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 150 LPM / 50 Mtr NAGLI AJAR SALEMPUR 29.180264 77.777803
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 Kl / 14 M NAGLI AJAR SALEMPUR 29.180264 77.777803
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0373
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.530
2 HDPE 90 3.009
3 HDPE 110 0.342
4 HDPE 125 0.235
5 HDPE 140 0.631
HSC Connection
Sno. Total Nos.
1 718
Other Details
3.82
3.82
3.14
08-Mar-2025
09-Mar-2025