Project Completion Certificate (Ground Water)
Scheme ID: 20082605 Name of Scheme: JALALPUR JORA & HATOOPURA No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1347 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 12-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.13 Mtr / 99.76 Mtr JALALPURJORA-HATOOPURA 29.052534 78.039383
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 150 LPM / 50 Mtr JALALPURJORA-HATOOPURA 29.052534 78.039383
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 Kl / 14 M JALALPURJORA-HATOOPURA 29.052534 78.039383
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0314
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.276
2 HDPE 75 1.281
3 HDPE 90 1.358
4 HDPE 110 0.707
5 HDPE 140 0.376
HSC Connection
Sno. Total Nos.
1 208
Other Details
1.87
1.87
1.57
31-Dec-2024
01-Jan-2025