| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20082417 | Name of Scheme: KARANGAON & USUF NAGAR WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 17 |
| Total Population Covered: 7216 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 14-Sep-2024 | Actual Date of Completion (Capex): 19-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150MM PLAIN PIPE | 3 | KARANGAON YUSUFNAGAR | 26.452339 | 81.5119 |
| 2 | 300MM PLAIN PIPE | 113 | KARANGAON YUSUFNAGAR | 26.452339 | 81.5119 |
| 3 | 300MM SLOTTED PIPE | 42 | KARANGAON YUSUFNAGAR | 26.452339 | 81.5119 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE PUMP | 760LPM / 56MTR | KARANGAON YUSUFNAGAR | 26.452339 | 81.5119 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 700KL / 20MTR | KARANGAON YUSUFNAGAR | 26.452339 | 81.5119 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 1.117 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 3.404 | |
| 2 | HDPE PIPE | 75 | 1.480 | |
| 3 | HDPE PIPE | 63 | 16.273 | |
| 4 | HDPE PIPE | 110 | 1.918 | |
| 5 | HDPE PIPE | 125 | 1.978 | |
| 6 | HDPE PIPE | 140 | 0.641 | |
| 7 | HDPE PIPE | 160 | 2.559 | |
| 8 | HDPE PIPE | 180 | 0.802 | |
| 9 | HDPE PIPE | 200 | 0.107 | |
| 10 | DI PIPE | 250 | 0.294 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1216 |