Project Completion Certificate (Ground Water)
Scheme ID: 20082408 Name of Scheme: MISRAULI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 10
Total Population Covered: 3501 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Sep-2024 Actual Date of Completion (Capex): 17-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 32.30 MISRAULI 26.4360444 81.6579475
2 300MM PLAIN PIPE 51.00 MISRAULI 26.4360444 81.6579475
3 150MM SLOTTED PIPE 15.00 MISRAULI 26.4360444 81.6579475
4 300MM SLOTTED PIPE 15.00 MISRAULI 26.4360444 81.6579475
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE PUMP 740LPM / 52MTR MISRAULI 26.4360444 81.6579475
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 225KL / 14MTR MISRAULI 26.4360444 81.6579475
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.0261
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 4.471
2 HDPE PIPE 63 11.586
3 HDPE PIPE 110 3.149
4 HDPE PIPE 140 1.598
5 HDPE PIPE 160 1.437
6 HDPE PIPE 200 0.680
HSC Connection
Sno. Total Nos.
1 715
Other Details
4.46
0.00
4.46
16-Sep-2024
02-Jan-2025