Project Completion Certificate (Ground Water)
Scheme ID: 20082270 Name of Scheme: DURGAPUR & HAIDHANA KALAN WSS No. of Villages: 3 No. of Habitation Covered: 29
Total Population Covered: 5443 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Mar-2024 Actual Date of Completion (Capex): 18-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00/83.30 DURGAPUR,HAIDHANA KALAN 26.440139 81.904055
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 1110LPM/45M DURGAPUR,HAIDHANA KALAN 26.440139 81.904055
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 325KL/14M DURGAPUR,HAIDHANA KALAN 26.440139 81.904055
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 PE100 63 25.871
2 HDPE PN-6 PE100 75 1.658
3 HDPE PN-6 PE100 90 2.470
4 HDPE PN-6 PE100 110 1.966
5 HDPE PN-6 PE100 125 3.126
6 HDPE PN-6 PE100 160 1.947
7 HDPE PN-6 PE100 180 1.034
8 HDPE PN-6 PE100 200 1.459
HSC Connection
Sno. Total Nos.
1 825
Other Details
407.72
0.00
416.07
10-Feb-2026
13-Jul-2026