Project Completion Certificate (Ground Water)
Scheme ID: 20081305 Name of Scheme: MADHAVARPUR WSS No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 4490 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Mar-2024 Actual Date of Completion (Capex): 28-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24/54.83 MADHAVPUR 26º 21' 10.261" N 82º 48' 12.271" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 36/44 MADHAVPUR 26º 21' 10.261" N 82º 48' 12.271" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink ALum Tank 175/12 MADHAVPUR 26º 21' 10.261" N 82º 48' 12.271" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 6.117
2 HDPE Pipe PN-6: Class PE-100 75 1.696
3 HDPE Pipe PN-6: Class PE-100 90 0.448
4 HDPE Pipe PN-6: Class PE-100 110 1.213
5 HDPE Pipe PN-6: Class PE-100 140 0.288
6 HDPE Pipe PN-6: Class PE-100 160 0.011
7 HDPE Pipe PN-6: Class PE-100 200 0.422
HSC Connection
Sno. Total Nos.
1 240
Other Details
223.13
0.00
0.00
24-Dec-2025
25-Dec-2025