Project Completion Certificate (Ground Water)
Scheme ID: 20080825 Name of Scheme: NARSINGAPUR SVS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3274 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2024 Actual Date of Completion (Capex): 30-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 26.0 M / 131.42 M NARSINGAPUR 27.51282 79.34609
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 700 LPM/ 61 M NARSINGAPUR 27.51282 79.34609
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 KL / 14 M NARSINGAPUR 27.51282 79.34609
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE / K-7 150 .03 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 .676 COMPLETE
2 HDPE 63 4.473 COMPLETE
3 HDPE 110 .056 COMPLETE
4 HDPE 140 .107 COMPLETE
5 HDPE 160 .206 COMPLETE
6 HDPR 180 1.500 COMPLETE
HSC Connection
Sno. Total Nos.
1 587
Other Details
2.47
2.42
2.39
30-Apr-2024
01-May-2024