Scheme ID: 20079148 Name of Scheme: 1.MANSOORPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3100 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-Mar-2024 Actual Date of Completion (Capex): 03-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 17/101.31 Mansoorpur 25.93339 80.509881
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submerssible Pump 650/63 Mansoorpur 25.93339 80.509881
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/16 Mansoorpur 25.93339 80.509881
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K-7 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.207
2 HDPE 75 1.946
3 HDPE 90 1.383
4 HDPE 110 0.835
5 HDPE 125 0.335
6 HDPE 140 0.388
7 HDPE 160 1.007
8 HDPE 200 0.015
HSC Connection
Sno. Total Nos.
1 510
Other Details
2.45
0.00
2.43
03-Jan-2025
04-Jan-2025