Project Completion Certificate (Ground Water)
Scheme ID: 20079058 Name of Scheme: PARADHANAI No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2150 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Mar-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 500 LPM 21.03/118.87 Paradhanai 25.988929 80.360354
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP SUBMERSIBLE PUMP 500 LPM/ 59 MTR Paradhanai 25.988929 80.360354
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ELEVATED STORAGE RESERVOIR 150KL/14M Paradhanai 25.988929 80.360354
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.619
2 HDPE 75 0.289
3 HDPE 90 0.345
4 HDPE 110 0.153
5 HDPE 160 1.855
6 HDPE 180 0.115
7 HDPE 200 0.140
HSC Connection
Sno. Total Nos.
1 405
Other Details
1.85
1.84
1.88
07-Dec-2025
08-Dec-2025