| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20077551 | Name of Scheme: sihutha hara mau | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 3033 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 14-Mar-2024 | Actual Date of Completion (Capex): 20-Dec-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 33.12/187.26 | SIHUTHA & HARAMAU | 26.415308 | 79.83133 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 800/68 | SIHUTHA & HARAMAU | 26.415308 | 79.83133 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225/20 | SIHUTHA & HARAMAU | 26.415308 | 79.83133 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K7 | 150 | 0.0156 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.707 | |
| 2 | HDPE | 90 | 2.838 | |
| 3 | HDPE | 110 | 1.225 | |
| 4 | HDPE | 125 | 0.022 | |
| 5 | HDPE | 140 | 1.521 | |
| 6 | HDPE | 180 | 1.124 | |
| 7 | HDPE | 200 | 0.815 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 771 |