Project Completion Certificate (Ground Water)
Scheme ID: 20077469 Name of Scheme: MADWAI BHUGANIYA PUR No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 2782 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 09-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 36.13/176.72 MADWAI& BHUGANIYAPUR 26.364184 79.932613
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 700/72 MADWAI& BHUGANIYAPUR 26.364184 79.932613
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/16 MADWAI& BHUGANIYAPUR 26.364184 79.932613
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.008
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 110 0.924
2 HDPE 63 6.070
3 HDPE 90 1.970
4 HDPE 140 1.305
5 HDPE 160 1.166
6 HDPE 180 1.125
HSC Connection
Sno. Total Nos.
1 828
Other Details
3.81
0.00
3.18
24-Mar-2024
25-Mar-2024