Project Completion Certificate (Ground Water)
Scheme ID: 20076918 Name of Scheme: CHAND PUR SVS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3701 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-Jun-2026 Actual Date of Completion (Capex): 09-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33M/128.47M CHAND PUR 27.39059 79.61426
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 800LPM/61M CHAND PUR 27.39059 79.61426
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225KL/14M CHAND PUR 27.39059 79.61426
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0248
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 4.506
2 HDPE 63 5.918
3 HDPE 110 1.471
4 HDPE 125 0.396
5 HDPE 140 0.505
HSC Connection
Sno. Total Nos.
1 996
Other Details
3.74
3.65
3.73
09-Jun-2025
10-Jun-2025