Project Completion Certificate (Ground Water)
Scheme ID: 20076877 Name of Scheme: SINGHIRAMPUR SVS No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 4184 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 17-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.0 M / 129.35 M ASTAL 27.24064 79.66299
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 850 LPM / 61 M ASTAL 27.24064 79.66299
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 KL/ 14 M ASTAL 27.24064 79.66299
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE / K-7 150 .012 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 4.764 COMPLETE
2 HDPE 63 6.559 COMPLETE
3 HDPE 110 .746 COMPLETE
4 HDPE 140 .704 COMPLETE
5 HDPE 160 1.251 COMPLETE
HSC Connection
Sno. Total Nos.
1 828
Other Details
3.75
3.66
3.73
17-Jul-2024
18-Jul-2024