Project Completion Certificate (Ground Water)
Scheme ID: 20076815 Name of Scheme: JIRAU SVS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3027 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 31-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.0 M / 106.74 M JIRAU 27.48735 79.29013
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 650 LPM/ 59 M JIRAU 27.48735 79.29013
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL / 12 M JIRAU 27.48735 79.29013
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE / K-7 100 0.03 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.02 COMPLETE
2 HDPE 63 6.473 COMPLETE
3 HDPE 110 1.495 COMPLETE
4 HDPE 140 .283 COMPLETE
5 HDPE 160 .041 COMPLETE
HSC Connection
Sno. Total Nos.
1 528
Other Details
2.91
2.83
2.89
31-May-2024
01-Jun-2024